搜索

Dard- Owen Sithole College, Replacement Of Asbestos, Replace With Metal Roof Sheet, Ceiling Board, Change Of Damage Pvc Gutters And Down Pipes, Three Timber Windows To Aluminum, Painting Of External And Internal Walls Plus Doors, Replacement Of Six Toilets Sets, Three Wash Hand Basin, Metal Door Frames, Hand Dryer, Six Tissue Holders And Two Soap Dispensers, Installation Of Missing Door, Wall Tiles And Skirting, Repositioning Of Two Geysers, Installation Of Shower Doors And Investigation Of Shower Base Blockage And Electrical Work.

招标公告

一般资料

   2025年12月4日
   英语
   其他
   已发布: 2025年12月4日

原文

Construction of buildingsDARD- Owen Sithole College, Replacement of asbestos, replace with metal roof sheet,
ceiling board, change of damage pvc gutters and down pipes, three timber windows to aluminum, painting of external and internal walls plus doors, replacement of six toilets sets, three wash hand basin, metal door frames, hand dryer, six tissue holders and two soap dispensers, installation...
会员选项

基本订阅

完全订阅

企业订阅

550美元/年

1000美元/年

费用 根据要求可以

购买 购买 联系我们
请注意:这篇招标信息公告只作为参考使用。
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。