The Purpose Of The Contract Consists Of The Drafting Of The Construction Project Corresponding To The Southern Extension Of Line 11 Of The Madrid Metro, From La Fortuna Station To Line 10. The Project Will Contemplate A Maximum Of 2 Stations, New Or Exchange. Connections With The Existing Metro Network, Vicinity And Other Means Of Transport Will Be Studied. The Expansion Of The Metro Network Must Materialize Through The Existing Subway Lines. The Contract Includes Both The Drafting Of The Construction Project And That Of The Necessary Documents For Environmental Processing, According To Law 21/2013 Of Environmental Impact Assessment, And The Realization Of All The Previous Works Of Diagnosis Of The Current Situation, Necessary For The Selection And Definition Of The Constructive Solution To Be Developed Through The Drafting Of The Constructive Project And The Elaboration Of The Documents That Compose It: Memory Together With Its Annexes, Plans, Sheets And Budget.
中标公示
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。