Pre-qualification / initial selection Construction of Civil Works designed by the Engineer & Design, Supply, Installation, Testing & Commissioning of Electrical & Mech. works of Chitral Hydroelectric Power Station and providing services during defects liability period (EXPIRED)

招标公告

一般资料

巴基斯坦
   Chitral
   C-E&M/HS-12/IFIS-002
   2023年2月21日
2023年3月1日
  
PAKISTAN - Water and Power Development Authority
   (i) The Applicant shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements estimated as US$ 1.0 Million for the subject contract(s) net of the Applicants other commitments.
(ii) The Applicant shall also demonstrate, to the satisfaction of the Employer, that it has adequate sources of finance to meet the cash flow requirements on works currently in progress and for future contract commitments.
(iii) The audited balance sheets or, if not required by the laws of the Applicant’s country, other financial statements acceptable to the Employer, for the last three (3) years shall be submitted and demonstrate the current soundness of the Applicant’s financial position. The Applicant's financial position will be deemed sound if at least two (2) of the following four (4) criteria are met.
a) Average earnings before interest, taxes, depreciation, and amortization (EBITDA) for the last three (3) years > 0;
b) Total equity (net worth) for the last three (3) years > 0;
c) Average liquidity ratio for the last three (3) years > 1
((Current assets) / (Current liabilities) > 1);
d) Average indebtedness ratio for the last three (3) years < 6
((Total financial liabilities) / (EBITDA) < 6)
Minimum average annual turnover of US$ 4 Million, for the last 5 years calculated as total certified annual payments received for contracts in progress and/or substantially completed.
Experience under construction contracts in the role of prime contractor, JV member, subcontractor, or management contractor for at least the last ten (10) years, starting 1st July 2012.
A minimum number of similar contracts specified below that have been satisfactorily and substantially completed as a prime contractor, joint venture member management contractor or subcontractor between 1st July 2012 and application submission deadline. 2 contracts, each of minimum value US$ 8 Million that have been successfully and substantially completed and are similar to the proposed works. Out of 2 projects, one project should be substantially completed by the bidder outside their home country. The similarity shall be based on the physical size, complexity and technicity of the Works.
   英语
   国际采购
   已发布: 2023年2月21日

联系信息

   Ihsan Ullah
General Manager
WATER AND POWER DEVELOPMENT AUTHORITY
105-WAPDA House Lahore
Lahore, Punjab 54000
巴基斯坦
   +924299202189
   +924236369004
   请单击此处
   wapda.gov.pk

货物、工程及服务

建筑物安装工作 电力分配及控制仪器 全部和部分建筑物作业和土木工程 电机设备安装服务 发动机,发电机及变电器

投标文件和附件

 
  • 询问及解答: Addendum - I to PQ / IS Document (202 KB; 2023年2月21日)
     Download documents

原文


More information: 请单击此处
请注意:这篇招标信息公告只作为参考使用。
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。