搜索

EPC Works for Establishment of New System Control Centres (EXPIRED)

招标公告

一般资料

柬埔寨
   Phnom Penh
   AFD-Grid-CW-001
   2025年2月21日
2025年3月27日
  
CAMBODGE - Electricité du Cambodge (EDC)
   a) Financial Criteria
The bidder must provide documents showing:
• A figure of average annual turnover in Plant Design, and/or Supply and/or Installation of 20,000,000 USD (twenty million USD) over the last three (3) years.
• Ability to access funding of 5,000,000 USD (Five million USD).

b) Experience and technical capacity
The bidder must provide documents showing:
• The Bidder is a qualified EPC Contractor or a SCADA/EMS/DMS software OEM.
• A minimum of 15 (fifteen) years of experience under construction contracts in Transmission (National or Regional) and/or Distribution Grid Control Centre project.
• Completion of at least 4 (four) contracts in the field of Transmission (National or Regional) and/or Distribution Grid Control Centre projects, each of minimum value 10,000,000 USD (ten million USD) during the last 15 (fifteen) years, including 2 (two) outside the bidder’s home country. At least 1 reference in Transmission Grid Control Centre project and 1 reference in Distribution Grid Control Centre project must be showcased. The Bidder is allowed to use global project references within its organization.
• SCADA/EMS/DMS OEM shall have a supply record of at least last 15 (fifteen) years in manufacturing SCADA with EMS and/or DMS systems. Evidence from at least 4 (four) end-users for a minimum of 3 (three) years satisfactory service record within the last 15 (fifteen) years of SCADA with EMS and/or DMS systems outside the manufacturer’s home country shall be provided. SCADA/EMS/DMS OEM shall have a valid ISO 9001: 2015 certificate
• IP-MPLS OEM shall have a supply record of at least last 10 (ten) years in manufacturing IP-MPLS routers. Evidence from at least 4 (four) end-users for a minimum of 3 (three) years satisfactory service record within the last 10 (ten) years of IP-MPLS networks, outside the manufacturer’s home country shall be provided. IP-MPLS OEM has a valid ISO 9001: 2015 certificate.
• Manufacturers of IT equipment used in the project must have a minimum of 10 years (ten) experience under manufacturing of such equipment, and must be ISO9001:2015 certified.

c) Environmental, Social, Health and Safety criteria
The bidder must demonstrate availability of a valid ISO certification or internationally recognized equivalent applicable to the worksite in:
• Occupational health and safety management systems (ISO 45001)
• Environmental management systems (ISO 14001)
• Quality management systems (ISO 9001)
   英语
   国际采购
   已发布: 2025年2月21日

联系信息

   Sovanmony Dork
Director of Procurement Department
Electricite du Cambodge
#2, St. Preah Yukunthor, Sangkat Wat Phnom, Khan Daun Penh
Phnom Penh 120211
柬埔寨
   + 855 23 723 971
   请单击此处
   www.edc.com.kh

货物、工程及服务

电力

投标文件和附件

 
  • 询问及解答: Clarification No. 5 (1135 KB; 2025年2月19日)
  • 询问及解答: Clarification No.1 (384 KB; 2025年1月9日)
  • 询问及解答: Clarification No. 6 (1405 KB; 2025年3月5日)
  • 询问及解答: MoM for pre-bid meeting (900 KB; 2025年1月9日)
  • 征集: Pre-bid meeting announcement (62 KB; 2024年11月22日)
  • 修正: Autocad drawing 4 (494 KB; 2025年1月16日)
  • 询问及解答: Clarification No. 4 (1273 KB; 2025年2月5日)
  • 附件: Input Data for Substation Automation v6 (147 KB; 2025年3月5日)
  • 附件: Autocad drawing 2 (203 KB; 2025年1月13日)
  • 附件: Autocad drawing 1 (494 KB; 2025年1月13日)
  • 询问及解答: Clarification No. 3 (1106 KB; 2025年1月16日)
  • 修正: Certifications and GIS requirements Addendum No. 3 (156 KB; 2025年3月18日)
  • 修正: Deadline Extension & Bid Security (4 MB; 2025年1月22日)
  • 征集: Invitation for bids (3 MB; 2024年10月28日)
  • 附件: Input Data for Substation Automation (122 KB; 2025年2月5日)
  • 附件: Autocad drawing 3 (219 KB; 2025年1月13日)
  • 修正: Deadline Extension Addendum No. 2 (4 MB; 2025年2月21日)
  • 询问及解答: Clarification No. 7 (330 KB; 2025年3月24日)
  • 询问及解答: Clarification No. 2 (737 KB; 2025年1月9日)