搜索

2.1.1 Pre-Design Studies, Detailed Design And Supervision Services (EXPIRED)

意向申请书

一般资料

汤加
   TO-MOH-449646-CS-QCBS
   2024年11月14日
2024年11月25日
  
Ministry of Health
   英语
   其他
   已发布: 2024年11月14日

联系信息

   Semisi Fukofuka
Ministry of Health
Ministry of Health, Taufa'ahau Rd, Tofoa, Tonga
汤加
   +676 779 8614
   请单击此处

项目分配

民用工程咨询服务

Additional resources

摘要

      

notice_summary_english: Detailed Design & Construction Supervision Services (DnS) for Tonga North Islands Group Healthcare Facilities
Reference No: TO-MOH-449646-CS-QCBS
The Ministry of Health (MoH) of the Kingdom of Tonga is expected to receive financing from the World Bank toward the cost of the Health Enhancement and Resiliency in Tonga Project (HEART) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the “Detailed Design & Supervision Services for Tonga North Islands Group Healthcare Facilities” to perform the following tasks in 3 Phases, but not limited to:
PHASE 1: Pre-Design Assessments & Studies for Northern Islands (Lump-Sum, 12 Months)
Master Planning 7+ hectares of the Prince Wellington Ngu Hospital (PWNH) site for the next 10 years of development;
Performing rapid and detailed assessments of 24 existing buildings at PWNH;
Preparing Environmental and Social due diligence documents for Project Component 2;
Assessing, planning, and preparing medical equipment/supply specifications and bid documents for PWNH and Northern Island CHCs and Nursing Clinics in Vava’u and Niua Island Group (6 facilities);
Assessing ICT and digital connectivity for PWNH and Northern Island CHCs and Nursing Clinic in Vava’u and Niua Island Group (6 facilities and including Vaiola Hospital in Nuku’alofa);
PHASE 2: Detailed Design of PWNH Hospital Facility (Lump-Sum, 15 months)
Providing detailed architectural and engineering studies, design, costings, plan, and prepare bid documents for a new 3600sqm hospital and new medical staff quarters at PWNH & the upgrade, retrofit, and/or strengthening of select existing buildings at PWNH;
Preparing Operations & Maintenance plans;
Providing Procurement Support;
PHASE 3: Construction Supervision and Monitoring of PWNH facility (Time-Based, not to exceed a maximum, 24 months)
Providing construction supervision and monitoring services for the development of PWNH.
The total level

原文


More information: 请单击此处
请注意:这篇招标信息公告只作为参考使用。
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。