搜索

The Development Of A Secure Combined Passage At The Existing Crossroads On The Road To Thionville N3 (Rue Du Camping /Rue De Syren) Cr154. The Development Of 2 "Tray" Slowdowers With A Length Of 12M At The Ends Of The Existing Area 30 And The Implementation Of Suggestive Tracks On The Cr154 In Alzingen. The Development Of A Combined Passage The Exit From Hassel And Bus Stops Will Be Brought Up To Standards With Reduced Mobility. The Pc11 Will Be Developed Along The Cr162, Over A Length Of Around 130.00 Ml, On The South Side, Between The Exit From Hassel And The Existing Pc11. The Pilot Project Provides For The Speed Reduction On The Cr154 To 50 Km/H Between The Pr (0.50+118–3.50+490) Thus The Implementation Of 4 Constructive Provisions Allowing The Occasional Reduction In Automobile Speed And The Implementation Of A Colored Coating. The Treatment Of Contaminated Materials Of The Trunk As Well As The Implementation Of Recycled Materials.

招标公告

一般资料

   2025年4月27日
   法语
   其他
   已发布: 2025年4月27日

原文

var consulation_ref='534210';
var organisme = 't5y';
var depotAutomatique = 0;
var pageTransmissionAffichee = 0;
var jetonSignatureMaxFileSize = 1048576;





Détail de la consultation










Date et heure limite de remise des plis :


11/06/2025 10:00












Référence :


2501039









Intitulé :


Aménagement de la PC11 entre...
会员选项

基本订阅

完全订阅

企业订阅

550美元/年

1000美元/年

费用 根据要求可以

购买 购买 联系我们
请注意:这篇招标信息公告只作为参考使用。
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。