搜索

The Purpose Of This Contract Is The Works And Supplies For The Extension And Reform Of The Changing Rooms, And The Extension Of The Biomass Installation Of The Football Field Of Sant Pere De Ribes, Within The Framework Of The Recovery, Transformation And Resilience Plan, Funded By The Next Generation Eu Funds. According To The Following Projects: - Basic And Executive Project Of Phases 1 And 3 Of The Changing Rooms Of The Football Field In The Sports Area Of ​​The Forest Of The Square, In Sant Pere De Ribes - Executive Project For The Extension Of The Installation Of Biomass Of The Blue Space To Be Able To Supply By Means Of Heat Network To The Facilities Of The Football Field This Project Is Co -Financed By The `` Ayudas' S Infrastructure For Mejora And Optimization Of Installations And Sports That Promote The Tourism Sustainable Deportivo, With A Cargo In The European Backgrounds Of The Recovery, Transformation And Resilience Plan. " This Action Is Fulfilled To The General Objectives Of The Politics Lever 9 "Promotion Of The Industry Of Culture And Sports" And, Component 26 "Plan Of Fomento Of The Deporte Sector", Investment 2 "-Plan Of Ecológica Transition Of Deportivas Installations. C26.I02.P01 Fomento Del Turismo Deportivo Sustainable" In The Framework Of The Recovery Plan, Resilience Of The European Union - Next Generation - Eu. The Contents Of This Contract Derives From The Project `` Renewal And Extension Of The Costumes Of The Field Of Football In The Deportiva Area Of ​​The Forest Of The Square, In Sant Pere De Ribes '', Approved By The Presidency Of The Higher Council Of Sports - Ministry Of Education, Professional Training And Sports, Within The Framework Of The Funds From The Recovery, Transformation And Resilience Plan, And Which Will Be Financed, Resilience Of The European Union - Next Generation - Eu. This Contract Is Subject To Commission Controls

招标公告

一般资料

   Barcelona
   2025年4月29日
   西班牙语
   其他
1023197 EUR
   已发布: 2025年4月29日

原文

01040601/2025/3L’objecte del present contracte són les obres i els subministraments per l’ampliació i reforma dels vestidors, i l’ampliació de la instal·lació de biomassa del camp de futbol de Sant Pere de Ribes, en el marc del Pla de Recuperació, Transformació i Resiliència, finançat pels fons Next Generation EU. D’acord amb els següents projectes: - Projecte bàsic i executiu de les fases 1 i 3...
会员选项

基本订阅

完全订阅

企业订阅

550美元/年

1000美元/年

费用 根据要求可以

购买 购买 联系我们
请注意:这篇招标信息公告只作为参考使用。
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。