This Public Works Contract Aims To Execute The Energy Rehabilitation Works Of The Pratdip Municipal Pavilion According To The Technical Characteristics And Conditions Determined In The Executive Project. In Line With Improving The Thermal Performance Of The Current Building, Reducing The Dependence On Conventional Sources, Reducing Its Carbon Imprint And Contributing To The Transition To A More Sustainable Energy System, The Main Actions In The Municipal Pavilion Are As Follows: -Energy Rehabilitation Of The Envelope With The Incorporation Of Passive Systems Through Ventilated Facade And Renovation Of Roof And Renovation With Sandwich And Renovation With A Roof And Renewal Of The Roofing Panel And Renovation With A Roof Renovation And Renovation With A Roof Renovation And Renovation Of Roof And Renovation Of Roofs And Renovation Of Roofing Panels And Renewal. Acoustic Inside. -Installation Of Photovoltaic Panels On The New Power Cover 40 Kw (48.48 Kwp) By Shared Self -Consumption Connected In The Interior Network, And Located On The South -Facing Skirt. -Proach Of The Interior Spaces, Both Public And Private, With The Relocation Of The Stands At A Higher Level In Order To Place Them Under The Changing Rooms, The Technical Rooms And The Warehouses, Maintaining The Strip Of Rooms Attached To The West Side Of The Building. -Existing Sports Cloth, Located At 0.00M, Maintaining The Current Dimensions Of 22.45X44.35M And An Area Of 1,028 M², Giving Fulfillment To The Pav-1 Card Of The Catalan Sports Council With Marking On A Handball Court, A Futsal Court, A Basketball Court, A Volleyball Court And Two Badminton Tracks. The Sports Court Will Be Divisible With Central Curtain To Create Two Tracks. -Given The Proximity Of The Pavilion With The Bar And The Internal Communication Existing Between The Pavilion And The Establishment, It Is Proposed To Keep It. The Total Area Of The Action Is 3,448 M2 And A Total Built Area Of 1,797 M2.
招标公告
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。