Maintenance (Regular And Winter): Lot 1.R439 Shares Rastovci-Pavlovica -P.Luka In Length From L = 22 Km And For The Period From 01.08.2025. Until 31.07.2026.Gode And Lot 2.R-439 Section P.Luka- Gornji Vakuf / Uskoplje In Length From L = 14.7 Km And R-438 Shares Of P.Luka- Secešić In The Length Of 4 Km. L = 18.7 Km For The Period From 01.08.2025. Until 31.07.2026 (The Possibility Of Concluding A Framework Agreement In Three (3) Years Is Envisaged, Ie For The Period From 01.08. 2025. To 31.07.2028
招标公告
我们努力在此网站发布最准确和最及时的信息,但我们不可能保证所有提供的信息都是完全正确的。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。